多做题,通过考试没问题!

Oracle认证考试

睦霖题库>其他计算机考试>Oracle认证考试

You notice that the elapsed time for an important database scheduler Job is unacceptably long. The job belongs to a scheduler job class and window. Which two actions would reduce the job's elapsed time?()

  • A、Increasing the priority of the job class to which the job belongs
  • B、Increasing the job's relative priority within the Job class to which it belongs
  • C、Increasing the resource allocation for the consumer group mapped to the scheduler job's job class within the plan mapped to the scheduler window
  • D、Moving the job to an existing higher priority scheduler window with the same schedule and duration
  • E、Increasing the value of the JOB_QUEUE_PROCESSES parameter
  • F、Increasing the priority of the scheduler window to which the job belongs
正确答案:B,C
答案解析:
进入题库查看解析

微信扫一扫手机做题