多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

In order to avoid misconnections due to a failed node in a Bidirectional Line Switched Ring (BLSR), Alarm Indication Signals (AISs) are sent on every channel normally terminating in that node. What is the name of this process?()

  • A、trunking
  • B、squelching
  • C、nodal bypass
  • D、bridge and roll
  • E、node failure insertion
正确答案:B
答案解析:
进入题库查看解析

微信扫一扫手机做题