多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

Refer to the exhibit. Users from the Engineering VLAN complain that every time Business VLAN users have a network connectivity issue, the Engineering VLAN users usually have problems experiencing slow response or network connectivity problems. After troubleshooting, an unauthorized switch 2 was found. This unauthorized switch has been a regular problem, assuming the root bridge function under the spanning-tree domain and causing the Engineering VLAN to be unstable. Which three of these actions could be suggested to fix the problem?()

  • A、Upgrade Spanning Tree Protocol to Rapid Spanning Tree Protocol.
  • B、Change Business VLAN PCs to switch 1 and switch 4.
  • C、Force the root bridge to be switch 2, instead.
  • D、Adjust spanning-tree timers (max-age and forward-delay).
  • E、Shut down all unused ports.
  • F、Use MSTP to separate the Engineering VLAN from the Business VLAN to optimize spanning-tree convergence time within each VLAN.
正确答案:A,E,F
答案解析:
进入题库查看解析

微信扫一扫手机做题