You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?()
- A、Compute the baseline statistics.
- B、Take an immediate AWR snapshot.
- C、Decrease the window size for the baseline.
- D、Decrease the expiration time for the baseline.
正确答案:A
答案解析:有

微信扫一扫手机做题