多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

A Catalyst switch has just been installed and configured, and is not working as expected. You have decided to capture multiple show command outputs to study. Which one command could you use that includes the output of many other show commands, such as show version and show running-config?()

  • A、show configuration
  • B、show memory
  • C、show stacks
  • D、show tech-support
正确答案:D
答案解析:
进入题库查看解析

微信扫一扫手机做题