多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

A workgroup switch is configured with all ports assigned to VLAN 2. In addition,all ports are configured as full-duplex FastEthernet. What is the effect of adding switch ports to a new VLAN on this switch?()

  • A、The additions will create more collision domains.
  • B、IP address utilization will be more efficient.
  • C、More bandwidth will be required than was needed previously.
  • D、An additional broadcast domain will be created.
  • E、The possibility that switching loops will occur will increase dramatically.
正确答案:D
答案解析:
进入题库查看解析

微信扫一扫手机做题